Fig. 2From: District cooling network optimization with redundancy constraints in SingaporeMILP pipe investment cost function. Investment and operation & maintenance costs for a single arc a ij over the pipe capacity \({\bar {\pi }}_{ij}\) (thick, blue). The curved line (thin, green) indicates a representative possible real non-linear cost functionBack to article page