Fig. 5From: District cooling network optimization with redundancy constraints in SingaporeAnnual load duration curve. Estimated duration curve (thin, green) and its discretization to 8 steps (thick, blue) as used by the optimization model. Step lengths correspond to time step weight w t and the relative load value to s t Back to article page