Fig. 9From: District cooling network optimization with redundancy constraints in SingaporePower flow during outage of cooling station at vertex 57. In this situation, the large pipe capacities south of vertex 13 are needed to transmit backup cooling power from the western three cooling stations to the central bay areaBack to article page